Smart Assistance Inc. - Free aptitude and exam preparation
← Back to home

Time and work Concept of MAN-DAY-HOUR with solved examples

September 22, 2020Lalit Tomar MAN-DAY-HOUR formula
Time and work

The man-day-hour formula lets you solve most time and work questions in one line. Learn the idea below, then open each solved example to check your working.

Concept of the Man-Day-Hour formula

1. More men can do more work.
2. More work needs more time.
3. More men can do the same work in less time.

Suppose M1 men working D1 days at H1 hours a day do W1 work, and M2 men working D2 days at H2 hours a day do W2 work. Then:

(M × D × H) / W = constant
(M1 D1 H1) / W1 = (M2 D2 H2) / W2
This works when all the workers are equally efficient. If men and women (or boys) have different efficiencies, first convert them to common units, as in Examples 3 to 6.

Solved examples

Ex.124 men can complete a work in 8 days working 6 hours a day. In how many days can 36 men complete half the work, working 12 hours a day?

(24 × 8 × 6) / 1 = (36 × D × 12) / (1/2)
1152 = 864 × D
D = 1152 / 864 = 4/3

Check: the whole work is 1152 man-hours, so half is 576. 36 men × 12 hours = 432 man-hours a day, and 576 / 432 = 4/3.

Ans. 4/3 days (1⅓ days)

Ex.224 men can do a work in 16 days. They start the work, and after 4 days 6 men leave. In how many more days is the remaining work finished?

Man-days stay constant for the same work.
Total work = 24 × 16 = 384 man-days
Work done in 4 days = 24 × 4 = 96 man-days
Remaining work = 384 − 96 = 288 man-days
Men left = 24 − 6 = 18

As an equation: 24 × 16 = 24 × 4 + 18 × D, so 18D = 288 and D = 16.

Ans. 16 days

Ex.336 men can do a work in 16 days. After 4 days, 6 men leave and 48 women join. If a man is twice as efficient as a woman, in how many more days is the remaining work finished?

Take M = 2 units and W = 1 unit of work per day.
Total work = 36 × 2 × 16 = 1152 units
Work done in 4 days = 36 × 2 × 4 = 288 units
Remaining work = 1152 − 288 = 864 units
Daily work now = 30 men + 48 women = 30 × 2 + 48 × 1 = 108 units

As an equation: 36 × 2 × 16 = 36 × 2 × 4 + (30 × 2 + 48 × 1) × D, so 108D = 864.

Ans. 8 days

Ex.45 men or 9 women can do a work in 19 days. In how many days can 3 men and 6 women do this work?

5 men = 9 women, so M / W = 9 / 5.
Take M = 9 units and W = 5 units.
Total work = 9 women × 19 days = 9 × 5 × 19 = 855 units
3 men + 6 women = 3 × 9 + 6 × 5 = 57 units a day
D = 855 / 57 = 15

Ans. 15 days

Ex.51 man, or 2 women, or 3 boys can do a work in 33 days. In how many days can 1 man, 1 woman and 1 boy together do it?

Method 1
Together they do 1 + 1/2 + 1/3 = (6 + 3 + 2)/6 = 11/6 of a man's daily work.
D × 11/6 = 33, so D = 18 days

Method 2
1 man = 2 women = 3 boys. Take M = 6, W = 3 and B = 2 units a day.
Total work = 1 × 6 × 33 = 198 units
Together: 6 + 3 + 2 = 11 units a day, so D = 198 / 11 = 18 days

Ans. 18 days

Ex.62 men and 3 women can complete a work in 10 days, while 3 men and 2 women can complete it in 8 days. In how many days can 9 men and 3 women do it?

(2M + 3W) × 10 = (3M + 2W) × 8
20M + 30W = 24M + 16W
14W = 4M, so M / W = 7 / 2
Take M = 7 and W = 2 units.

Total work = (2 × 7 + 3 × 2) × 10 = 200 units
9 men + 3 women = 9 × 7 + 3 × 2 = 69 units a day
D = 200 / 69

Ans. 200/69 days (about 2.9 days)

Ex.7A, B and C complete a work in 5 days: A works all 5 days, B works on days 1 and 2, and C works on days 3, 4 and 5. B and C together do as much work in 2 days as A alone does in 3 days. If B and C together can finish the work without A in 6 days, in how many days can B alone finish it?

(B + C) × 2 = A × 3, so the efficiency ratio (B + C) : A = 3 : 2.
Take (B + C) = 3 units a day and A = 2 units a day.
B and C together finish the work in 6 days, so total work = 3 × 6 = 18 units.

In the 5-day schedule: 5A + 2B + 3C = 18
5 × 2 + 2B + 3C = 18, so 2B + 3C = 8
Write 2B + 3C = 2(B + C) + C = 2 × 3 + C = 6 + C, so C = 2.
Then B = 3 − 2 = 1.

Check: 10 + 2 × 1 + 3 × 2 = 18 ✓
B alone: 18 / 1 = 18 days

Ans. 18 days

Ex.8A certain number of men can do a work in 60 days. If there were 8 more men, it could be finished in 10 days less. How many men are there?

Method 1
Let there be x men. With x + 8 men the work takes 60 − 10 = 50 days.
The 8 extra men working 50 days do the work that x men do in the 10 days saved.
8 × 50 = x × 10, so x = 40

Method 2 (man-days are constant)
60 × x = 50 × (x + 8)
60x = 50x + 400, so 10x = 400 and x = 40

Ans. 40 men

Follow Smart Assistance:

Discussion & Comments

Comments